and we will be happy to help.
Transforming Retail Network Infrastructure at Enterprise Scale for the World's Largest Tire Manufacturer
About Client
The world’s largest tire manufacturer, operating an extensive retail network of more than 2,300 stores across the United States. The organization relies on high-performance network connectivity to power critical in-store operations, including ERP and Point of Sale (PoS) systems, while delivering a seamless omni channel customer experience.
Key Challenge
The client’s legacy network infrastructure was impacting store connectivity, employee productivity, and customer experience. Inconsistent access to critical ERP and PoS systems affected operational efficiency and revenue recognition, while transforming more than 2,300 locations introduced significant deployment and standardization complexity. Strict downtime windows and reliance on manual configurations and onsite engineers further increased cost, risk, and deployment timelines.
Objective / Goal
Modernize the retail network at enterprise scale while minimizing business disruption. The goal was to establish a secure, standardized, and automation-led network foundation that could accelerate store deployments, improve connectivity and user experience, reduce manual intervention, and support reliable omnichannel retail operations.
Solution
Microland deployed a Fortinet SD-Branch and SASE-based architecture, leveraging its intelligeni NetOps platform and intelligeni Transform module to automate the network transformation. Pre-built HLD and LLD templates and intelligeni Bots automated site-specific configurations, while Zero Touch Provisioning (ZTP) eliminated the need for onsite configuration. Automated post-deployment testing, diagnostics, remediation, and integrated logistics tracking enabled centralized governance and a high-velocity rollout of 20–25 stores per day with minimal disruption.
Business Value Delivered
- 2,300+ retail stores transformed, creating a standardized and modernized network foundation nationwide.
- 12,000+ engineering hours saved through Zero Touch Provisioning and elimination of onsite configurations.
- 35% reduction in transformation timeline, accelerating time-to-market through automation and reduced human error.
- 40% reduction in project management effort through centralized orchestration and automation-led workflows.
- Rollout accelerated to 20–25 stores per day, enabling transformation at enterprise scale with minimal disruption.
- The case study also highlights $12M+ projected savings, 2X improvement in user experience, and zero business disruption during transformation.



